Horizontal Baler Replacement at Distribution Centre

Brampton, ON

A 28,000 lb horizontal baler was removed and replaced inside a high-volume distribution warehouse in Brampton. The project required careful planning to keep operations moving while installing the new unit in a single day.

28,000 Lbs

Weight Relocated

1 Day

Timeline

Project Details

Client Industry

Recycling & Waste Management

Equipment Weight

28,000 Lbs

Special Equipment

Versa-Lift 40/60 , Hyster 15,000 Lbs Capacity Forklift, Machine Moving Dollies

Completed Date

March 2026

Project Overview

A major distribution warehouse in Brampton, Ontario required the replacement of an aging horizontal baler used to compress large volumes of cardboard generated from daily shipping operations. Because the facility processes significant packaging waste throughout the day, extended downtime was not an option.

The new baler arrived on site while the facility remained fully active. Our team was tasked with removing the existing unit and installing the replacement machine while keeping disruption to warehouse operations as minimal as possible.

The project required coordinated movement of both machines through an internal ramp area, carefully lowering the old unit and pushing the new 28,000-lb baler into position within the same working window.

To meet the tight timeline, Solid Hook deployed additional crew members and specialized moving equipment to complete the entire replacement safely within a single day.

The Challenge

• High-volume distribution facility generating constant cardboard waste • Limited shutdown window for replacing critical equipment • Heavy 28,000 lb horizontal baler located inside an active warehouse • Machines had to be moved up and down a ramp within the facility • Coordinating removal and installation within the same operational shift

Our Solution

• Deployed additional manpower to accelerate removal and installation • Used forklifts and controlled pushing techniques to manage ramp movement • Carefully extracted the old baler while protecting surrounding warehouse infrastructure • Positioned and installed the new baler in the same footprint • Completed the replacement within a single day to keep warehouse operations moving

Results

The existing baler was safely removed and the 28,000 lb replacement unit installed within the same day. By coordinating manpower and equipment, the Solid Hook team minimized operational disruption for the busy distribution facility, allowing the client to resume full waste-processing capacity immediately.

28,000 Lbs

Weight Relocated

1 Day

Timeline

horizontal baler replacement inside brampton distribution center machinery moving

Frequently Asked Questions

Related Industrial Projects

  • Metal stud roll forming machine being lifted from open-top container by machinery movers in Toronto Ontario

    Drywall Metal Stud Roll Forming Machine Offload

    22,000 Lbs

    Weight Relocated

    Manufacturing

    Industry

    Machinery Moving, Rigging

    Services Provided

    Toronto, ON

    Location

    View Full Case Study
  • Industrial press being erected using dual Versa-Lift forklifts inside manufacturing facility in Brampton Ontario

    Aluminum Tray Press Erection and Installation

    24,000 Lbs

    Weight Relocated

    Food Packaging Manufacturing

    Industry

    Machinery Moving, Rigging, Welding

    Services Provided

    Brampton, ON

    Location

    View Full Case Study
  • CNC stone bridge saw being extracted from shipping container using Landoll trailer and dock leveler without loading=

    CNC Bridge Saw Container Extraction Without Dock Access

    20,000+ lbs

    Weight Relocated

    Stone Fabrication

    Industry

    Machinery Moving, Rigging

    Services Provided

    Scarborough, ON

    Location

    View Full Case Study

Discuss your project with Us.

Planning a Machinery Move? Let’s Structure It Properly.

Our coordinators respond within 24 hours.

Talk To A Project Coordinator.

or write us back at Info@solidhook.ca